The Greystone Design Management Construction team was hired by the City of Abbotsford to repair this bridge that was damaged by the floods in 2021. After collaborating with the geotechnical engineer, we developed a plan to safely repair the bridge and increase its longevity. We first filled in the sections that were washed out with rip-rap. Then we installed gravel, compacted the area, paved, and reinstalled the no post barriers allowing the City to reopen the bridge.