Greystone Stabilization Solutions (GSS) was tasked with stabilizing the hillside of a property in Abbotsford, located off Tweedsmuir Road, where a boulder retaining wall required additional support. Upon assessment by the GSS team, in accordance with the geotechnical engineer’s guidance, soil anchors were strategically drilled and mesh was applied to reinforce and stabilize the boulders. Following the mesh application, the team meticulously secured it in place using nuts, plates, and cables. Working diligently, the project was completed within 5 days, ensuring the property’s safety and stability for years to come.