The City of Abbotsford - Clayburn Creek Trail and Auguston Creek Trail Repair

The City of Abbotsford – Clayburn Creek Trail and Auguston Creek Trail Repair

The City of Abbotsford has enlisted Greystone Design Construction to repair and revitalize the Clayburn Creek Trail and Auguston Creek Trail, two popular pathways cherished by local residents. These trails have suffered significant damage, with multiple sections completely washed out, posing safety concerns and rendering portions of the paths inaccessible. To ensure the trails are…

Preventing Landslides and Erosion in Abbotsford: The Role of Slope Stabilization

Preventing Landslides and Erosion in Abbotsford: The Role of Slope Stabilization

With its scenic landscapes and rolling terrain, Abbotsford is home to beautiful hillsides and essential infrastructure built along natural slopes. However, these elevated areas face challenges from erosion and landslides, particularly during the heavy rainfall that is common in the Fraser Valley. These natural processes can endanger public infrastructure, impact transportation routes, and require costly…

Bateman Park Bridge Repair No.2

The crew is back at Bateman Park in Abbotsford to tackle another bridge replacement, repairing damage caused by the 2021 floods. Since completing our first bridge repair at Bateman Park in November 2023, the community has been eagerly awaiting this next phase of restoration. We’re proud to announce that our team completed the project in…

Sustainable Building Practices in Construction: Essential Steps for a Greener Future

Sustainable Building Practices in Construction: Essential Steps for a Greener Future

In the face of climate change and increasing environmental concerns, the construction industry is under pressure to adopt sustainable business practices. By integrating eco-friendly methods and materials, construction companies can reduce their environmental impact and contribute to a healthier planet. Here are some sustainable building practices every construction project should incorporate: Eco-Friendly Materials and Design…

Blog – Union Bar Road Retaining Wall

Greystone Design Management Construction team successfully constructed an Ankora Retaining Wall for a residential property in Hope, BC. Alair Homes required slope stabilization to ensure the safe continuation of the home’s construction. Due to the limited excavation room between the house and the hillside, a traditional MSE retaining wall was not feasible. The GDM Construction…