Bateman Park Bridge Repair No.2

The crew is back at Bateman Park in Abbotsford to tackle another bridge replacement, repairing damage caused by the 2021 floods. Since completing our first bridge repair at Bateman Park in November 2023, the community has been eagerly awaiting this next phase of restoration. We’re proud to announce that our team completed the project in…

Blog – Union Bar Road Retaining Wall

Greystone Design Management Construction team successfully constructed an Ankora Retaining Wall for a residential property in Hope, BC. Alair Homes required slope stabilization to ensure the safe continuation of the home’s construction. Due to the limited excavation room between the house and the hillside, a traditional MSE retaining wall was not feasible. The GDM Construction…

Greystone Stabilization Solutions (GSS) Case Study – Abbotsford, Tweedsmuir Road

Greystone Stabilization Solutions (GSS) was tasked with stabilizing the hillside of a property in Abbotsford, located off Tweedsmuir Road, where a boulder retaining wall required additional support. Upon assessment by the GSS team, in accordance with the geotechnical engineer’s guidance, soil anchors were strategically drilled and mesh was applied to reinforce and stabilize the boulders.…

Marine Drive Stabilization

Marine Drive Stabilization

Greystone Design Management Construction was hired by the City of White Rock to undertake a vital project: the stabilization of two critical sections along the bustling Marine Drive. Renowned as a lifeline for both vehicular traffic and pedestrians, Marine Drive demanded meticulous attention. Over the span of three months, Greystone Design Management Construction made a…

GSS Case Study – Crescent Beach Home

GSS Case Study – Crescent Beach Home

Greystone Stabilization Solutions (GSS) embarked on a crucial mission to restore stability to a homeowner’s property, which had suffered significant damage from heavy rainfall in 2021. With meticulous planning and expert execution, the GSS team swiftly prepared the site, laying the groundwork for a seamless operation. Utilizing advanced drilling techniques, GSS meticulously installed soil anchors…

Barrowtown Pump Station

Barrowtown Pump Station

Greystone Design Construction was hired by the City of Abbotsford to widen the dike at the Barrowtown Pump Station. Given the limited available space, GDM Construction collaborated closely with a geotechnical engineer to determine the optimal solution. It was concluded that the safest approach to widening the dike and expanding the road would entail the…

Ruth Johnson Park and Centennial Trails Landslide Repair

Ruth Johnson Park and Centennial Trails Landslide Repair

In 2020, Ruth Johnson Park and Centennial Trails underwent closure due to a landslide, necessitating comprehensive rehabilitation measures. The City of White Rock entrusted Greystone Design Construction with the task of restoring the trail system, including the reinstatement of staircases. Greystone Design Construction commenced the project with meticulous site preparation, encompassing the removal and excavation…