Barrowtown Pump Station
Greystone Design Construction was hired by the City of Abbotsford to widen the dike at the Barrowtown Pump Station. Given the limited available space, GDM Construction collaborated closely with a geotechnical engineer to determine the optimal solution. It was concluded that the safest approach to widening the dike and expanding the road would entail the…