The City of Abbotsford - Clayburn Creek Trail and Auguston Creek Trail Repair

The City of Abbotsford – Clayburn Creek Trail and Auguston Creek Trail Repair

The City of Abbotsford has enlisted Greystone Design Construction to repair and revitalize the Clayburn Creek Trail and Auguston Creek Trail, two popular pathways cherished by local residents. These trails have suffered significant damage, with multiple sections completely washed out, posing safety concerns and rendering portions of the paths inaccessible. To ensure the trails are…

Preventing Landslides and Erosion in Abbotsford: The Role of Slope Stabilization

Preventing Landslides and Erosion in Abbotsford: The Role of Slope Stabilization

With its scenic landscapes and rolling terrain, Abbotsford is home to beautiful hillsides and essential infrastructure built along natural slopes. However, these elevated areas face challenges from erosion and landslides, particularly during the heavy rainfall that is common in the Fraser Valley. These natural processes can endanger public infrastructure, impact transportation routes, and require costly…

Blog – Union Bar Road Retaining Wall

Greystone Design Management Construction team successfully constructed an Ankora Retaining Wall for a residential property in Hope, BC. Alair Homes required slope stabilization to ensure the safe continuation of the home’s construction. Due to the limited excavation room between the house and the hillside, a traditional MSE retaining wall was not feasible. The GDM Construction…

Greystone Stabilization Solutions (GSS) Case Study – Abbotsford, Tweedsmuir Road

Greystone Stabilization Solutions (GSS) was tasked with stabilizing the hillside of a property in Abbotsford, located off Tweedsmuir Road, where a boulder retaining wall required additional support. Upon assessment by the GSS team, in accordance with the geotechnical engineer’s guidance, soil anchors were strategically drilled and mesh was applied to reinforce and stabilize the boulders.…

Marine Drive Stabilization

Marine Drive Stabilization

Greystone Design Management Construction was hired by the City of White Rock to undertake a vital project: the stabilization of two critical sections along the bustling Marine Drive. Renowned as a lifeline for both vehicular traffic and pedestrians, Marine Drive demanded meticulous attention. Over the span of three months, Greystone Design Management Construction made a…

Ruth Johnson Park and Centennial Trails Landslide Repair

Ruth Johnson Park and Centennial Trails Landslide Repair

In 2020, Ruth Johnson Park and Centennial Trails underwent closure due to a landslide, necessitating comprehensive rehabilitation measures. The City of White Rock entrusted Greystone Design Construction with the task of restoring the trail system, including the reinstatement of staircases. Greystone Design Construction commenced the project with meticulous site preparation, encompassing the removal and excavation…

Project Update: Restoration of the Salmon Ridge Trail (City of Chilliwack)

In the summer of 2022, Greystone Stabilization Solutions embarked on a crucial project for the City of Chilliwack: the restoration of the Salmon Ridge trail. Nestled behind a picturesque residential neighborhood overlooking the Chilliwack River, this trail had suffered significant erosion, necessitating urgent stabilization efforts. With precision and expertise, our dedicated team meticulously prepared the…